Paying for your D-MSS-DS-23 materials is simple and secure — Lead2Passed recommends Credit Card, a widely used option for international online payments, and the support team resolves any payment questions about your EMC Dell Midrange Storage Solutions Design 2023 order quickly.
EMC D-MSS-DS-23 Exam Overview:
| Certification Vendor: | Dell EMC |
|---|---|
| Exam Name: | Dell Midrange Storage Solutions Design 2023 |
| Exam Number: | D-MSS-DS-23 |
| Exam Price: | $230 USD |
| Exam Format: | Scenario-Based, Multiple Choice |
| Certificate Validity Period: | 2 years |
| Real Exam Qty: | 48–60 |
| Exam Duration: | 90 minutes |
| Passing Score: | 63% |
| Available Languages: | French, English, Japanese, Chinese |
| Related Certifications: | Dell Unity Storage Design Dell PowerStore Design |
| Recommended Training: | Midrange Storage Solution Design (ESSTGD04959) Midrange Storage Performance Planning (ESSTGD05299) |
| Exam Registration: | Pearson VUE Registration |
| Sample Questions: | DOWNLOAD DEMO |
| Exam Way: | Online proctored or Onsite at Pearson VUE test centers |
| Pre Condition: | Recommended: Hands-on experience with Dell Unity and PowerStore; completion of training courses: Midrange Storage Solution Design, Midrange Storage Performance Planning, Unity Design, PowerStore Design |
| Official Syllabus URL: | https://education.dell.com/content/dam/dell-emc/documents/en-us/D-MSS-DS-23-Design_midrange_Exam_.pdf |
EMC D-MSS-DS-23 Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| Dell Midrange Sizing Solutions | 24% | - Sizing deliverables and design documentation - Using Midrange Sizer tool for Unity - Using PowerSizer tool for PowerStore - Sizing for performance, capacity and scalability |
| Dell Midrange Storage Solutions Planning, Sizing and Design | 40% | - Design principles and solution architecture - Site assessment and environmental considerations - Solution planning and requirements gathering - Workload characterization and analysis |
| Dell Midrange Storage Solutions Best Practice | 36% | - Deployment models and upgrade best practices - Security, access control and compliance - High availability and resilience design - Storage architecture and data protection design - Unity and PowerStore product features and comparison |
What Candidates Ask Before Preparing for D-MSS-DS-23 with Lead2Passed
- Dell Midrange Storage Solutions Planning, Sizing and Design (40%)
- Dell Midrange Sizing Solutions (24%)
- Dell Midrange Storage Solutions Best Practice (36%)
EMC Dell Midrange Storage Solutions Design 2023 Sample Questions:
While sizing a PowerStore solution with 5 TB usable capacity and 5000 IOPS for a Test/Development Application using NVMe drives, a solution architect observes that the recommended solution is 10 times the requested capacity. What action must the architect take?
- A. Change the DRR of the solution.
- B. Change the DRE Tolerance Parity in System Editor.
- C. Configure the Unity solution as an alternative.
Correct Answer: A 🗳️
Explanation: Only visible for Lead2Passed members. You can sign-up / login (it's free).
What is the maximum RPO that can be configured on a Dell Unity XT block-asynchronous replication session?
- A. 14 days
- B. 48 hours
- C. 7 days
- D. 24 hours
Correct Answer: D 🗳️
Which tool can be used to migrate file data for Windows hosts from a legacy VNX array to a new Dell Unity XT array?
- A. SANCopy
- B. Robocopy
- C. Rsync
Correct Answer: B 🗳️
Explanation: Only visible for Lead2Passed members. You can sign-up / login (it's free).
What does the Storage Performance Saturation field show in the Configurations tab of the PowerStore sizing tool in a Multi-Appliance solution?
- A. Aggregate of all capacity
- B. Maximum Performance
- C. Maximum usable capacity
- D. Aggregate of all workloads
Correct Answer: D 🗳️
Explanation: Only visible for Lead2Passed members. You can sign-up / login (it's free).
A company has a Dell Unity XT 880 at its Boston site providing file storage for a business production application. The company has a second remote site 8 km (5 mi) away in Cambridge. A third site is in New York (342 km (213 mi) from the Boston site). How can the same production data be protected against system outage with a zero RPO and a maximum of 15 minutes RPO data recovery?
- A. Synchronous replicate from Boston to Cambridge Asynchronous replicate from Boston to New York
- B. Synchronous replicate from Boston to Cambridge Synchronous replicate from Cambridge to New York
- C. Synchronous replicate from Boston to Cambridge Synchronous replicate from Boston to New York
- D. Asynchronous replicate from Boston to Cambridge Asynchronous replicate from Cambridge to New York
Correct Answer: A 🗳️
Explanation: Only visible for Lead2Passed members. You can sign-up / login (it's free).
Viewing page 1 out of 18 pages.
Viewing questions 1-5 out of 88 questions.

1205 Customer Reviews
