Microsoft MB-335 (Microsoft Dynamics 365 Supply Chain Management Functional Consultant Expert) exam is designed to test your skills and expertise in using Microsoft Dynamics 365 Supply Chain Management. Microsoft Dynamics 365 Supply Chain Management Functional Consultant Expert certification is intended for those who have extensive experience in streamlining business processes, identifying and resolving issues, and ensuring the successful implementation and operation of the Dynamics 365 Supply Chain Management application.


Microsoft MB-335 certification exam covers a range of topics, including supply chain management concepts, procurement and sourcing, inventory management, warehouse management, transportation management, and demand planning. MB-335 exam is designed to test the candidate's ability to configure and customize Dynamics 365 for Finance and Operations to meet business requirements, as well as their ability to troubleshoot and resolve issues related to supply chain management processes. By passing this certification exam, professionals can demonstrate their expertise in supply chain management and enhance their career opportunities in this field.

 

NEW QUESTION # 28
You need to set up the state control for sales of motorcycles.
Which two actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.

  • A. Create an exclusive restricted product list for Missouri and add the motorcycle part to the list.
  • B. Create an inclusive restricted product list for United States. Do not add the motorcycle part to the list.
  • C. Create an exclusive restricted product list for California and add the motorcycle part to the list.
  • D. Create an inclusive restricted product list for United States and add the motorcycle part to the list.

Answer: C,D

Explanation:
Reference:
https://stoneridgesoftware.com/working-with-restricted-products-in-dynamics-365-operations/
Topic 3, Case Study 3 Adventure Works
This is a case study. Case studies are not timed separately. You can use as much exam time as you would like to complete each case. However, there may be additional case studies and sections on this exam. You must manage your time to ensure that you are able to complete all questions included on this exam in the time provided.
To answer the questions included in a case study, you will need to reference information that is provided in the case study. Case studies might contain exhibits and other resources that provide more information about the scenario that is described in the case study. Each question is independent of the other question on this case study.
At the end of this case study, a review screen will appear. This screen allows you to review your answers and to make changes before you move to the next section of the exam. After you begin a new section, you cannot return to this section.
To start the case study
To display the first question on this case study, click the button. Use the buttons in the left pane to explore the content of the case study before you answer the questions. Clicking these buttons displays information such as business requirements, existing environment, and problem statements. If the case study has an All Information tab, note that the information displayed is identical to the information displayed on the subsequent tabs. When you are ready to answer a question, click the button to return to the question.
Background
Adventure Works Cycles is a high-end bicycle manufacturer in North America. Their standard model bicycles are available year-round. Limited-edition bicycle models are released several times a year to boutique retailers domestically.
Adventure Works has had the most success with their limited-edition bicycles. These bicycles have high margins, are in high demand, and have a strong following with the younger generation biking community.
Current environment
General
Adventure Works expects to triple their manufacturing capabilities in the next few years due to increasing demand. The company plans to invest in Dynamics 365 Finance, Dynamics 365 Supply Chain Management, and the Power Platform products to migrate from a custom-built enterprise resource planning (ERP) solution and Microsoft Excel worksheets.
Adventure Works sells only to the United States and Canada. Despite their limited market, they cannot keep up with current demand. Over time, they want to expand their market to remain profitable.
Adventure Works has no capabilities or budget to undertake any development beyond Excel formula-level tasks.
Bicycle manufacturing
Bicycle models are measured and reported against how well a single model performs as a sum of all the variations of that model. For example, the Street Kid YOLO model sold 25,000 units in 2019 across all variations of the product, but the Purple Female frame made up 30 percent of that model's sales.
The Street Kid YOLO models sell in different volumes depending on the market.
The creation of production orders for bicycles occurs monthly and is based on historical sales.
Each part of a bicycle's assembly occurs at a different station in the Adventure Works production facility.
A piece of paper that has eight sections accompanies a bicycle throughout the manufacturing process.
As each step is completed, the respective section is completed and signed off by a production worker.
The completed paper is used in the put-away process by the warehouse workers.
Financials
The standard model and limited-edition bicycle teams are separate operating units within the manufacturing division. Financials are tracked and reported separately even though they are produced and sold in the same sales channels.
Updates to the standard model bicycle models are created when a part for a bicycle becomes unavailable. This can change the cost of the product.
An updated model of a bicycle with new parts will be maintained as a new item and have a new price.
However, it will look like the exact same product to retailers and distributors.
Manufacturing process
The bicycle manufacturing process is shown in the following graphic:

Limited-edition bicycle process
The limited-edition bicycles are made up of an Adventure Works custom frame with all other parts created by local artists and manufacturers.
Each bicycle has a unique set of new items that make up the bill of materials (BOM) because all parts are created to specification.
A single pilot limited-edition bicycle is created as a proof of concept.
Adventure Works occasionally reuses components from existing bicycles, but most limited-edition bicycles are made of handcrafted components designed to specifications.
Each limited-edition bicycle is built, and hand signed by a single Adventure Works artisan.
Sales price must be auto calculated after the cost price is derived.
Before creating the proof of concept limited-edition bicycle, the approximate sales price needs to be determined through a cost-plus 20 percent calculation.
All items except for the frame in the prototype process are considered finished items and can be sold individually.
The frame items require modifications in accordance with the manufacturing process as well as painting.
Each Adventure Works limited-edition bicycle artisan is scheduled to create a specific number of bicycles in a production run that must be completed by a certain date.
Limited-edition bicycle artisans work exclusively on a given run of limited-edition bicycles and are not able to work on other tasks.
Limited-edition bicycle BOM assembly process
The prototype process for the limited-edition bicycles is shown in the following graphic:

Requirements
General
Adventure Works will consist of three legal entities: the primary legal entity of the United States (AWUS), sales in Canada (AWCA), and an international expansion (AWIN).
AWIN must be able to sell only standard model bicycles.
AWUS and AWCA must be able to sell both standard model and limited-edition bicycles.
Warehouse workers must use the Warehouse Management mobile application to manage all inventory inbound and outbound from the warehouse.
Bicycle manufacturing
The handlebars, back wheels, and front wheels must not change for any of the bicycle model configurations.
Standard model bicycle production scheduling must be configured to start as soon as possible.
Bicycle components must be automatically reserved when the item is released to the production floor.
Standard model bicycle production must be automatically created on a predefined schedule.
As soon as bicycles are completed, they must be available to fulfill the backlog of orders.
Limited-edition bicycle production must be configured to meet the end date for when the bicycles must be completed.
Production orders need to track financials by standard model or limited-edition bicycle manufacturing teams.
The system must log the immediate consumption of BOMs for traceability.
All inventory is warehouse enabled.
Finished goods are reported as finished by the warehouse worker who picks up the finished product from the packaging area.
Finished products must automatically have put-away work completed for them.
New limited-edition bicycle process
Adventure Works is creating a new, limited-edition bicycle to commemorate the company's tenth anniversary.
The limited-edition bicycle will be designed for charity events and be produced for the summer season.
The bicycle must be available in men's, women's, and unisex frame styles. It will be painted in one of
50 hand-painted designs representing the charity of the customer's choosing.
A limited run of 100 bicycles must be created.
The limited-edition bicycles must use the same production process as the standard model bicycles.
The limited-edition bicycles must use the same parts used for previous limited-edition bicycles, except for the unique paint colors.
Frames must be painted in-house.
Five painting options are available only in the unisex frame style.
New limited-edition bicycle orders
Customers must be able to place sales orders for the item in the chosen frame configuration, including style and color.
When an order for the new limited-edition bicycle is created, payment must be provided.
An approval for an order must exist for the order to be processed.
Upon approval of an order, production must start immediately and not require re-entry of data.


NEW QUESTION # 29
You need to determine the sales price for a new limited-edition bicycle for the summer season.
What should you do?

  • A. Run inventory close for the BOM items for the limited-edition bicycle.
  • B. Run the category price rules for the limited-edition bicycle using a cost-plus calculation.
  • C. Run the pricing simulator for the limited-edition bicycle for a quantity of one.
  • D. Create the production order for the limited-edition bicycle and click estimate.

Answer: D


NEW QUESTION # 30
A manufacturer uses Dynamics 365 Supply Chain Management to create bicycle parts as a configure-to-order configuration. All bicycle parts are sourced from external sources and assembled in the manufacturing facility.
The manufacturer plans to expand its capabilities to create custom bicycles parts in an engineer-to-order model. All bicycle parts will be created in the manufacturing facility. The custom bicycle parts must be omitted from any master planning process.
You need to describe the concepts for the requirements.
Which concepts should you use? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation
To describe the concepts for the requirements, you should use the following:
Redesign the manufacturing facility for the new facility capabilities: You should use the Discrete concept. Discrete manufacturing is a type of manufacturing that produces distinct items that can be easily counted, touched, or seen1. Discrete manufacturing is suitable for producing custom bicycle parts in an engineer-to-order model, because it allows you to create unique products based on customer specifications and engineering drawings2. Discrete manufacturing also supports complex production processes that involve multiple steps, resources, and materials2.
Configure for the engineer-to-order items: You should use the Supply policies concept. Supply policies are rules that determine how supply is generated for a product based on its demand3. Supply policies can be configured at the product level, the product master level, or the coverage group level3. For engineer-to-order items, you can configure a supply policy that omits them from any master planning process. For example, you can set the coverage code to None, which means that no planned orders are generated for the product. You can also set the replenishment system to None, which means that no replenishment orders are generated for the product.
1: What is discrete manufacturing? 2: Discrete manufacturing overview 3: Supply policies : [Coverage codes] :
[Replenishment systems]


NEW QUESTION # 31
You need to resolve the issue for UserE.
Which configuration options should you use? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:


NEW QUESTION # 32
A company uses multiple Dynamics 365 applications to track and repair equipment.
The company wants to improve its repair order process. Repair technicians frequently encounter unexpected issues daily. The technicians must be empowered to address the issues and create new work orders by doing the following:
* Provide step-by-step, just-in-time training for work order completion in the field by using videos and text.
* Document work order creation in a single, printable document.
* Report on the use of hands-on training.
You need to implement a solution forth requirements.
Which solution should you implement for each requirement? To answer, drag the appropriate solutions to the correct requirements. Each solution may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.

Answer:

Explanation:


NEW QUESTION # 33
A company makes engine parts used in the automotive industry.
They are in the process of retooling an existing manufacturing plant. They are looking to use Dynamics 365 for Finance and Operations to help support the Bill of Materials (BOM) product lifecycle for engineering version control.
You must translate existing production processes into the proper elements. You need to create BOM lifecycle states to translate existing production processes into the proper elements.
What type of BOM product lifecycle state should you create? To answer, select the appropriate BOM state in the answer area.

Answer:

Explanation:

Explanation


NEW QUESTION # 34
You are the production supervisor in charge of setting effective cost prices for the labor force in a manufacturing company.
It is the end of the year and the labor rates have been recalculated based on new salary data.
You need to update the effective labor costs for all labor groups.
Which element must be updated?

  • A. cost groups
  • B. production orders
  • C. resource group
  • D. shared category
  • E. cost category

Answer: E

Explanation:
A cost category is a classification of costs that are related to an operations resource or a routing operation1. A cost category can have one or more cost elements, such as labor, machine, subcontractor, or material1. A cost element represents a specific type of cost that is incurred for an operations resource or a routing operation2.
To update the effective labor costs for all labor groups, you must update the cost category that is assigned to the labor groups. You can use the Cost categories page to modify the cost elements and rates for the cost category3. You can also use the Costing versions page to create a new costing version with updated cost categories and activate it for future production orders.


NEW QUESTION # 35
A company overstates on-hand raw materials due to the time it takes to post raw materials as consumed when production orders are processed.
All items used to manufacture finished goods must be consumed when a finished good is reported as finished. You must not change all bill of materials lines to use the option of flushing principal.
You need to ensure that all production orders consume raw materials at Report as finished.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

1 - In the Production order status section of Production control, select Start
2 - In the Picking list journal, select Always in the Automatic BOM consumption
3 - In the Production order status section of Production control, select Report as finished
4 - Select Make default for all users
Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/production-control/production-parameters-manufacturing-execution


NEW QUESTION # 36
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to It. As a result, these questions will not appear in the review screen.
A manufacturing plant uses Lean processes. You plan to outsource a painting operation to a subcontracting vendor. You create a service item named SP-01 to represent the painting service.
You need to create a subcontracting activity for the painting service.
Solution:
* Create a purchase agreement for the subcontracting vendor and add SP-01 as the painting service.
* Create a vendor resource then create a work cell for outsourced painting and add the resource to the work cell.
* Create a production flow process activity for the painting work cell and add the component to be painted as a picking activity.
* Create a server term to tie the purchase agreement to the activity.
Does the solution meet the goal?

  • A. No
  • B. Yes

Answer: A

Explanation:
The solution does not meet the goal. Here is the explanation:
To create a subcontracting activity for the painting service, you should use the following steps1:
Create a vendor warehouse for the subcontracting vendor. This step is missing in the solution, but it is required to track the inventory that is located at the vendor's site. You need to create a warehouse that is assigned to the vendor account and set it as vendor-managed1.
Create a vendor resource and add it to a new work cell for outsource painting. This step is correct, because you need to create a resource that is assigned to the vendor account and add it to a resource group that represents the subcontracting work cell1. This way, you can assign the subcontracting activity to the vendor resource.
Create a production flow process activity for the painting work cell and add the component to be painted as a picking activity. This step is incorrect, because you need to add the service item (SP-01) as the product of the process activity, not the component to be painted1. The service item represents the subcontracting service that is provided by the vendor. You also need to select the Generate license plate option on the mobile device menu item that is used for reporting as finished1.
Create a purchase agreement for the subcontracting vendor and add SP-01 as the painting service. This step is correct, because you need to create a purchase agreement that defines the terms and conditions for purchasing the subcontracting service from the vendor1. You also need to add a purchase agreement line for SP-01 and specify the quantity and price of the service.
Create a server term to tie the purchase agreement to the activity. This step is incorrect, because you need to create a service term that links the purchase agreement line to the production flow process activity1. A service term defines how a service item is consumed in production and how it is invoiced by the vendor.
1: Activity-based subcontracting


NEW QUESTION # 37
A manufacturing company uses Dynamics 365 Supply Cham Management.
The company identifies a bill of materials (BOM) item that needs to be recalled for a product The engineering department needs to link customer support incidents and knowledgebase articles related to the product change.
Other items affected by this change must reference the same support incidents and knowledgebase articles.
You need to recommend features to facilitate this business process.
Which features should you recommend? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:


NEW QUESTION # 38
A manufacturer is implementing Dynamics 365 Supply Chain Management to create blends of oil and industrial lubricant.
The manufacturer requires detailed documentation for the production order process before manufacturing begins for the products. The shop floor must review, approve, and anticipate all production runs. Before production starts, the manufacturer wants to ensure that the order can be completed by a certain timeframe based on capacity.
You need to define the production life cycle stages.
Which five actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

1 - Create a production order.
2 - Estimate the order.
3 - Schedule production jobs.
4 - Release the order.


NEW QUESTION # 39
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A manufacturing plant uses Lean processes. You plan to outsource a painting operation to a subcontracting vendor. You create a service item named SP 01 to represent the painting service.
You need to create a subcontracting activity for the painting service.
Solution:
* Create a vendor warehouse for the subcontracting vendor.
* Create a vendor resource and add it to a new work cell for outsource painting.
* Create a production flow transfer activity and specify the vendor warehouse as The target warehouse.
Does the solution meet the goal?

  • A. No
  • B. Yes

Answer: A

Explanation:
Explanation
The solution does not meet the goal. Here is the explanation:
To create a subcontracting activity for the painting service, you should use the following steps1:
Create a vendor warehouse for the subcontracting vendor. This step is correct, because you need to create a warehouse that is assigned to the vendor account and set it as vendor-managed1. This way, you can track the inventory that is located at the vendor's site.
Create a vendor resource and add it to a new work cell for outsource painting. This step is correct, because you need to create a resource that is assigned to the vendor account and add it to a resource group that represents the subcontracting work cell1. This way, you can assign the subcontracting activity to the vendor resource.
Create a production flow transfer activity and specify the vendor warehouse as the target warehouse. This step is incorrect, because you need to create a production flow process activity, not a transfer activity, for the subcontracting service1. A process activity represents an operation that transforms material into products or semi-finished goods2. A transfer activity represents a movement of material or products from one location to another2. You also need to specify the service item (SP 01) as the product of the process activity, and select the Generate license plate option on the mobile device menu item that is used for reporting as finished1.


NEW QUESTION # 40
A company plans to account for indirect costs related to materials used to manufacture products.
The items used to manufacture products have surcharge rates that depend on the type of product being used.
You need to set up the costing sheet to include surcharges for specific items.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

1 - Create cost groups for indirect and direct costs
2 - Create a node-type sucharge under the indirect cost group..
3 - Assign a cost group to the items


NEW QUESTION # 41
A manufacturer is implementing Dynamics 365 Supply Chain Management with warehouse management processes (WMS).
Warehouse workers use hand-held devices to pick and stage batch-tracked products for production. The warehouse manager requires that products are removed from on-hand inventory and consumed when they are picked and staged for production.
You need to remove the products from on-hand inventory.
What should you configure?

  • A. flushing principle, start
  • B. mobile device menu item, start production order
  • C. flushing principle, available al location
  • D. manufacturing execution, job card device

Answer: A

Explanation:
The flushing principle is a setting that determines how and when the raw materials are consumed from inventory and registered as work in progress (WIP) for production orders and batch orders1. The flushing principle can be configured at the product level, the bill of materials (BOM) or formula line level, or the production order or batch order line level1.
The Start flushing principle indicates that the material will be automatically consumed when the production order is started1. The amount of material that is consumed is proportional to the quantity that is started. This principle is relevant if, for example, the variance in the consumption is low, the materials are low-value materials, there are no tracking requirements, or there's a short run time on operations1.
In this scenario, the warehouse manager requires that products are removed from on-hand inventory and consumed when they are picked and staged for production. Therefore, the Start flushing principle should be configured for the batch-tracked products. This way, the products will be deducted from inventory and set to WIP as soon as the production order is started on the hand-held device.


NEW QUESTION # 42
A company overstates on-hand raw materials due to the time it takes to post raw materials as consumed when production orders are processed.
All items used to manufacture finished goods must be consumed when a finished good is reported as finished.
You must not change all bill of materials lines to use the option of flushing principal.
You need to ensure that all production orders consume raw materials at Report as finished.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

Explanation

Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/production-control/production-parameters-manufac


NEW QUESTION # 43
You need to resolve the issue for UserB.
What are two possible ways to achieve this goal? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.

  • A. Create a catch weight item.
  • B. Set up configuration and weight for partial visibility.
  • C. Set up configuration and weight for full visibility.
  • D. Create a product master with predefined variants for ounces and boxes.

Answer: A,C


NEW QUESTION # 44
You need to address the ignition switch issue.
Which three actions should you perform? Each answer presents part of the solution.
NOTE: Each correct selection is worth one point.

  • A. Define business impact.
  • B. Copy link and products.
  • C. Set product readiness to automatic.
  • D. Set product readiness to manual,
  • E. Change product lifecycle state.

Answer: A,D,E

Explanation:
Adatum Corporation is a multi-entity corporation located in Seattle, Washington in the United States. The company is a leading producer of specialty cakes and cookies. The company also manufactures specialty chocolates that use ethically sourced ingredients from around the world. The company plans to launch a new product line of organic chocolates later this year.
Adatum plans to implement Dynamics 365 Finance and Dynamics 365 Supply Chain Management to manage financials, inventory, and manufacturing capabilities across the entire organization.
* Manufactured products are stored at the distribution warehouses until they are shipped to customers.
* Individually branded pre-packaged cake and cookie mixes are supplied to specialty cafes and restaurants. The mixes are shipped directly to the cafes and restaurants from the production factories.
* The company maintains a fleet of trucks and also subcontracts shipments between the factories and warehouses to outside vendors.
* The mixes and specialty chocolates are based on standard recipes that use precise ingredient ratios. There are strict rules around ingredient substitutions.
* All mixes use one of three base recipes as their foundation: BaseA, BaseB. and BaseC. Additional ingredients, spices, and flavorings are then added to make the final product.
* BaseA and BaseB are made in large batches and stored until they are used in the other mixes.
* Mixes with BaseA have a shelf life of six months due to the type of flour it uses.
* Specialty chocolates are manufactured only during the holiday season.
* Specialty desserts are offered during the holiday season. This year, customers may specify additional icing colors and cake layers when placing orders. Depending on the popularity of two of the new colors, they may be offered the next year.
* Cocoa oil that is extracted during the production of some of the specialty chocolates is used in the BaseB foundation mix.
* Cleaning and setup of machinery between products has been causing delays in production.
* Prices of raw ingredients such as sugar can fluctuate greatly depending on seasonal and worldwide demand.
* To properly record profitability, ail raw materials use the first in, first out (FIFO) costing method, while finished products are recorded at standard costs.
* Large fluctuations have been occurring at month end in costs reported due to the inability to track production runs that span from month-to-month.
* Leftover flour and sugar from production runs are collected, packaged, and donated to local food banks if the amount is too small to use in other runs.
* To maintain Adatum's certification as a manufacturer of ethically sourced ingredients, the traceability of every ingredient in all products to their source must be tracked.
* All products must be randomly tested for adherence to quality standards for ingredient makeup and weight.
* Similar recipes must be able to be produced in succession to limit machinery cleaning and setup times.
* All costs must be tracked for each production run and be able to be reconciled at the end of the monthly accounting cycle, including any work in process (WIP) costs and donations.
* The organic chocolate line must be set up. The ingredients cannot be mixed with non-organic ingredients in inventory.
* Mixes are generally stored and sold in 16-ounce bags. Some quantities are sold and distributed in 5. 10. and 20-gallon containers to large restaurants.
* Each mix has a single unique item number and is tracked per batch produced.
* Specialty chocolate products must be stored in climate-controlled areas of the warehouse.
* QA TesterA discovers during a random test that the batch of a mix does not contain the necessary amount of IngredientB.
* VendorZ, who transports finished goods from PlantA to Warehouses, is consistently late picking up product.
* OperatorA must consolidate partial mix batch group runs into saleable package quantities.
* UserB must set up the mix items.
* UserC learns that mixes containing BaseA have been stamped with a batch date from the flour vendor and is not being calculated from the mix manufacturing date. The mixes from the past month that might be impacted need to be identified and the calculation needs to be corrected.
* UserD must update the costs of finished goods. Accounting wants labor calculated in WIP based on how much time an individual spends performing the operation, as well as the finished goods to post to a specific different ledger account.
* UserE must set up and maintain the cost of sugar.
* UserF must decrease downtime for the machinery.
* UserG must plan the specialty desserts for the current holiday season.


NEW QUESTION # 45
A company makes engine parts used in the automotive industry.
They are in the process of retooling an existing manufacturing plant. They are looking to use Dynamics 365 for Finance and Operations to help support the Bill of Materials (BOM) product lifecycle for engineering version control.
You must translate existing production processes into the proper elements. You need to create BOM lifecycle states to translate existing production processes into the proper elements.
What type of BOM product lifecycle state should you create? To answer, select the appropriate BOM state in the answer area.

Answer:

Explanation:


NEW QUESTION # 46
......