NEW QUESTION # 19
You want to have several plan dates calculated in a maintenance plan.Which scheduling parameter do you use?
- A. Scheduling indicator
- B. End Date for Scheduling
- C. Scheduling period
- D. Call horizon
Answer: C
Explanation:
To have several plan dates calculated in a maintenance plan, you use the scheduling period parameter. The scheduling period defines the time interval for which the system calculates the planned dates for the maintenance plan. For example, if you enter 12 months as the scheduling period, the system calculates the planned dates for the next 12 months from the current date. You can also specify the end date for scheduling, which is the last date for which the system calculates the planned dates. The scheduling indicator determines how the system calculates the planned dates based on the cycle, the shift factor, and the tolerance. The call horizon defines the percentage of the cycle that must be expired before the system generates a call object (such as a maintenance order or notification) for the planned date.
NEW QUESTION # 20
How can you assign a material BOM to a piece of equipment?
- A. Via creation of an equipment BOM
- B. Via field model number in the equipment master
- C. Via material BOM header in the serialization data
- D. Via field construction type
Answer: D
Explanation:
A material BOM is a list of components that make up a material. It can be used to describe the structure and composition of a product or a spare part. A material BOM can be assigned to one or more technical objects, such as equipment or functional locations, to define the materials required for maintenance activities1.
One way to assign a material BOM to a piece of equipment is via the field construction type in the equipment master. The construction type is a material number that identifies the material BOM for the equipment. By entering the construction type in the equipment master, the system automatically assigns the material BOM to the equipment2.
The other options are incorrect because:
Via field model number in the equipment master: The model number is a material number that identifies the material of the equipment itself, not the material BOM. It is used to create an equipment BOM, which is a list of components that are installed on the equipment. An equipment BOM can be different from a material BOM, as it can reflect the actual configuration of the equipment2.
Via material BOM header in the serialization data: The serialization data is a view in the material master that contains information about the serial numbers of the material. It is not related to the material BOM or the equipment assignment3.
Via creation of an equipment BOM: The creation of an equipment BOM is a different process from the assignment of a material BOM. An equipment BOM can be created from a material BOM, but it does not automatically assign the material BOM to the equipment. An equipment BOM can also be created manually or copied from another equipment2.
NEW QUESTION # 21
What are valid item categories for a BOM used in Asset Management? Note: There are 3 correct answers to this question.
- A. F (Functional location)
- B. I (PM Structure element)
- C. D (Document item)
- D. E (Equipment)
- E. L (Stock item)
Answer: B,C,E
NEW QUESTION # 22
How does the work center influence cost calculation in the maintenance order? Note: There are 2 correct answers to this question
- A. Via cost center and activity type
- B. Via organizational unit and personal hourly rate
- C. Via cost center assigned to a personnel number
- D. Via activity type and hourly rate
Answer: A,D
Explanation:
Explanation
The work center influences cost calculation in the maintenance order via the cost center and activity type, and via the activity type and hourly rate. The cost center and activity type are assigned to the work center in the master data, and they determine the planned costs of the work center. The activity type and hourly rate are used to calculate the actual costs of the work center based on the actual hours reported for the maintenance order operations.
Option A (Via cost center assigned to a personnel number) is incorrect, because the cost center assigned to a personnel number is not relevant for the cost calculation of the work center. Option C (Via organizational unit and personal hourly rate) is also incorrect, because the organizational unit and personal hourly rate are not used to calculate the costs of the work center.
References:
Cost Centers and Activity Types
Work Center Utilization
NEW QUESTION # 23
You want to set up a general maintenance task list for inspection rounds using the overall time confirmation as a simplified way to record measurement documents. What do you need to do? Note: There are 2 correct answers to this question
- A. Assign a measuring point as a production resources/tools (PRT) to a task list operation.
- B. Assign a piece of equipment with an allocated measuring point to a task list operation
- C. Assign an inspection lot to the task list header
- D. Assign an inspection document as a PRT to the task list operation.
Answer: A,B
Explanation:
To set up a general maintenance task list for inspection rounds using the overall time confirmation as a simplified way to record measurement documents, you need to do the following steps:
Assign a piece of equipment with an allocated measuring point to a task list operation. This will allow you to inspect the equipment and record the measurement readings for the measuring point during the inspection round. You can assign the equipment either manually or automatically using the object list in the task list header1.
Assign a measuring point as a production resources/tools (PRT) to a task list operation. This will allow you to inspect the measuring point and record the measurement readings for it during the inspection round. You can assign the measuring point either manually or automatically using the PRT category 0010 (Measuring Point) in the task list operation1.
You do not need to assign an inspection lot to the task list header, as this is not required for inspection rounds. Inspection lots are used for quality inspections that are triggered by events such as goods receipt, production order, or sales order2.
You do not need to assign an inspection document as a PRT to the task list operation, as this is not supported for inspection rounds. Inspection documents are used for quality inspections that are based on inspection plans and inspection characteristics2. Reference: PM - General maintenance task list and Set up your SAP S/4HANA system for EAM Inspection Checklists in SAP Help Portal.
NEW QUESTION # 24
Which parameter in a maintenance strategy do you use to set the start/end date of the maintenance order?
- A. Call horizon
- B. Package offset
- C. Initial/subsequent buffer
- D. Scheduling type
Answer: A
Explanation:
Explanation
The call horizon is the parameter in a maintenance strategy that determines the start/end date of the maintenance order. The call horizon defines the percentage of the maintenance cycle that must be expired before the system generates a call object, such as a maintenance order or notification. The start date of the call object is calculated by adding the callhorizon to the last completion date of the maintenance plan. The end date of the call object is calculated by adding the maintenance cycle to the last completion date of the maintenance plan. The call horizon can be used to control the scheduling of preventive maintenance activities and ensure that they are performed within the planned time frame. References:
Preventive Maintenance in SAP S/4HANA, Lesson 2: Using Cycle Set Sequences, page 13-14 Highlights for Asset Management in SAP S/4HANA 2021, New Scope Items, Fig. 2: Standardized end-to-end process Proactive Maintenance (4HH)
NEW QUESTION # 25
Which views can you assign to an equipment category via a view profile? Note: There are 2 correct answers to this question?
- A. Manufacturer data
- B. Warranty
- C. Serial data
- D. Configuration
Answer: A,B
Explanation:
Explanation
An equipment category defines the technical characteristics of an equipment and the views that are available for it. A view profile is a set of views that can be assigned to an equipment category. The views that can be assigned to an equipment category via a view profile are:
Basic data
Classification
Location
Organization
Partner
Status
Structure
Warranty
Manufacturer data
Measurement document
History
Permits
Documents
User fields
Serial data
Configuration
Object links
Time-dependent data
Linear data
Geographical data
Maintenance plan
Maintenance item
Maintenance task list
Maintenance order
Maintenance notification
Service order
Service notification
Service contract
Service confirmation
Service quotation
Service request
Service plan
Service item
Service task list
Service product
Service product allocation
Service product structure
Service product location
Service product partner
Service product status
Service product classification
Service product documents
Service product permits
Service product user fields
Service product serial data
Service product configuration
Service product object links
Service product time-dependent data
Service product linear data
Service product geographical data
Among these views, the ones that match the options given in the question are Warranty and Manufacturer data.
Therefore, the correct answers are A and D.
References:
SAP Help Portal - Equipment Category
SAP Help Portal - View Profile
NEW QUESTION # 26
Which capabilities does SAP Service and Asset Manager (formerly SAP Asset Manager) provide? Note: There are 3 correct answers to this question
- A. SAP Service and Asset Manager can run on smart watches.
- B. SAP Service and Asset Manager can be used offline.
- C. SAP Service and Asset Manager provides single sign-on functionality.
- D. SAP Service and Asset Manager is available only for the iOS platform.
- E. SAP Service and Asset Manager is available for SAP S/4HANA and SAP ERP
Answer: A,B,E
Explanation:
Explanation
SAP Service and Asset Manager is a cloud-based mobile app that provides the following capabilities:
SAP Service and Asset Manager is available for SAP S/4HANA and SAP ERP. This means that the app can integrate with both systems and access the data and processes related to asset management and service operations12 SAP Service and Asset Manager can be used offline. This means that the app can store data locally on the device and synchronize it with the backend system when the network connection is available. This enables the users to work in remote areas or in situations where the network is unreliable12 SAP Service and Asset Manager can run on smart watches. This means that the app can leverage the features of wearable devices such as voice control, notifications, and sensors. This enhances the user experience and productivity of the field technicians13 SAP Service and Asset Manager does not provide the following capabilities:
SAP Service and Asset Manager does not provide single sign-on functionality. This means that the app requires the users to enter their credentials to log in to the app and the backend system. The app does not support any other authentication methods such as biometric or token-based2 SAP Service and Asset Manager is not available only for the iOS platform. This means that the app can run on both iOS and Android devices. The app supports the native features and user interface of both platforms12 References: 1: SAP Service and Asset Manager | Mobile Asset Management iOS & Android App 3: SAP Service and Asset Manager | Mobile asset management 2: SAP Service and Asset Manager Overview | SAP Help Portal
NEW QUESTION # 27
You want to assign components to a General Maintenance Task List. What are prerequisites for assigning material components to a task list operation? Note: There are 2 correct answers to this question
- A. Assign the BOM usage for free assignment of material in Customizing
- B. Assign the header material of a material ROM to the assembly field of the task list header
- C. Assign a piece of equipment with allocated material BOM to a task list operation.
- D. Assign the header material of a material BOM as assembly to a task list operation.
Answer: A,C
Explanation:
Explanation
To assign material components to a task list operation, you need to meet the following prerequisites:
You need to assign the BOM usage for free assignment of material in Customizing. This allows you to assign any material BOM to a task list operation, regardless of the assembly.This is option B in the question.
You need to assign a piece of equipment with allocated material BOM to a task list operation. This allows you to use the material BOM of the equipment as a source of components for the task list operation.This is option D in the question.
Option A is incorrect because you cannot assign the header material of a material BOM as assembly to a task list operation. You can only assign the header material of a material BOM to the assembly field of the task list header.
Option C is incorrect because you cannot assign the header material of a material ROM to the assembly field of the task list header. A material ROM is a routing-oriented material, which is used for production orders, not for maintenance task lists.
References:
Process Task List | SAP Help Portal
Processing Maintenance Orders - SAP Learning
NEW QUESTION # 28
Which scheduling parameters are used in a multiple-counter plan? Note: There are 2 correct answers to this question.
- A. Scheduling indicator
- B. Start date
- C. Scheduling period
- D. Factory calendar
Answer: B,C
NEW QUESTION # 29
Which are the prerequisites for Inspection Checklist Processing? Note: There are 2 correct answers to this question
- A. QM inspection plan with assigned inspection characteristics
- B. Classification data assigned to a technical object
- C. Master inspection characteristics assigned to PM task list operations
- D. Inspection point type assigned to the task list header
Answer: A,B
Explanation:
Explanation
This is required to define the inspection scope and the checklist type for the technical object. The inspection plan must be classified with the same class as the technical object and have matching characteristic values1.
Classification data assigned to a technical object: This is required to identify the relevant inspection plan and checklist type for the technical object. The technical object must be classified with the same class as the inspection plan and have matching characteristic values1.
The other options are not correct because:
Inspection point type assigned to the task list header: This is not a prerequisite for inspection checklist processing, but an optional setting that allows the user to define inspection points for the checklist items2.
Master inspection characteristics assigned to PM task list operations: This is not a prerequisite for inspection checklist processing, but an optional setting that allows the user to use master inspection characteristics as checklist items2.
References:
1: Explaining Inspection Checklists - SAP Learning 2: Generating Inspection Checklists | SAP Help Portal
NEW QUESTION # 30
Which views can you assign to an equipment category via a view profile? Note: There are 2 correct answers to this question?
- A. Manufacturer data
- B. Warranty
- C. Serial data
- D. Configuration
Answer: A,B
NEW QUESTION # 31
How does a performance-based maintenance plan calculate the interval between start date and planned date?
- A. Cycle length divided by (monthly performance x 12)
- B. Cycle length divided by ((scheduling period) x (cycle modification factor))
- C. Cycle length divided by (annual performance/365)
- D. Cycle length divided by annual performance
Answer: D
Explanation:
Explanation
A performance-based maintenance plan calculates the interval between start date and planned date by dividing the cycle length by the annual performance. The cycle length is the time or counter reading that is required for one maintenance cycle. The annual performance is the estimated time or counter reading that the object will achieve in one year. For example, if the cycle length is 100 hours and the annual performance is 2000 hours, then the interval is 100/2000 = 0.05 years or 18.25 days. References:
Asset Management in SAP S/4HANA Cloud 2208 | SAP Blogs, section "Final Due Date in Maintenance Orders Based on the Compliance Calculation Method (+ demo)" Highlights for Asset Management in SAP S/4HANA 2021 | SAP Blogs, section "Final Due Date, offered via business function LOG_EAM_IME_1" SAP Help Portal: Maintenance Plan
NEW QUESTION # 32
Which functions characterize a Strategic analysis as opposed to embedded analysis within the SAP S/4HANA core system? Note: There are 2 correct answers to this question
- A. Preconfigured Core Data Service (CDS) containing SQL views
- B. A collection of tools that are not included with core SAP S/4HANA
- C. SAP Business Objects Business Intelligence for Visualization
- D. SAP Business Objects as a part of SAP Business Warehouse (BW)
Answer: B,C
Explanation:
Explanation
Strategic analysis is a type of analysis that provides a high-level overview of the business performance and trends, as well as the ability to drill down into the details and performroot cause analysis. Strategic analysis is typically performed by business analysts or managers who need to make strategic decisions based on the data.
Strategic analysis requires a collection of tools that are not included with core SAP S/4HANA, such as SAP Analytics Cloud, SAP Business Planning and Consolidation, SAP Business Warehouse, and SAP Business Objects Business Intelligence. These tools enable the integration, transformation, modeling, and visualization of data from various sources, including SAP S/4HANA and other systems. Embedded analysis, on the other hand, is a type of analysis that provides real-time insights into the operational data within the SAP S/4HANA core system. Embedded analysis is typically performed by end users or operational managers who need to monitor and optimize the business processes and transactions. Embedded analysis relies on preconfigured Core Data Services (CDS) views that contain SQL views of the data in SAP S/4HANA. These views can be accessed by SAP Fiori apps, SAP Smart Business KPIs, or SAP Analysis for Microsoft Office. SAP Business Objects is not a part of SAP Business Warehouse, but a separate product that can connect to SAP Business Warehouse or other data sources. Therefore, option C is incorrect. References:
SAP S/4HANA Asset Management - Analytics, section "Strategic Analysis"
SAP S/4HANA Asset Management - Analytics, section "Embedded Analysis"
SAP S/4HANA Asset Management - Analytics, section "SAP BusinessObjects Business Intelligence"
NEW QUESTION # 33
Which functionalities belong to the current portfolio of SAP Business Objects Business Intelligence? Note: There are 2 correct answers to this question.
- A. SAP Lumira
- B. SAP Crystal Reports
- C. SAP Quick Viewer
- D. Plant Maintenance Information Systems (PMIS)
Answer: A,B
NEW QUESTION # 34
What is characteristic for a maintenance order with status REL- if you also consider the capabilities of business functions? Note: There are 3 correct answers to this question.
- A. The controller can determine actual cost surcharges.
- B. The planner can change estimated costs only at the header level
- C. The planner can change planned costs at the operation level
- D. Goods receipts for external services can be entered.
- E. The assignment of the notification to the maintenance order header cannot be deleted.
Answer: A,D,E
Explanation:
A maintenance order with status REL means that the order is released and ready for execution. At this stage, the following characteristics apply:
A: Goods receipts for external services can be entered. This is true because external services are procured through purchase orders that are linked to the maintenance order. The service performer can post service entry sheets to record the executed work and consumable materials. These service entry sheets can be approved and posted as goods receipts for external services1.
B: The planner can change planned costs at the operation level. This is false because once the order is released, the planned costs are frozen and cannot be changed by the planner. The planner can only change the estimated costs at the header level2.
C: The planner can change estimated costs only at the header level. This is true, but it is not a characteristic of a released order. The planner can change the estimated costs at any time, even before the order is released2.
D: The controller can determine actual cost surcharges. This is true because the controller can use the business function LOG_EAM_CI_7 to calculate and post actual cost surcharges for maintenance orders. This function can be used for orders with status REL or TECO3.
E: The assignment of the notification to the maintenance order header cannot be deleted. This is true because the notification is the source document for the maintenance order and provides the reason for the order. The notification can only be deleted if the order is deleted or set to status CRTD. References: 1: Lean and Limit Value Services in Maintenance Order 2: Maintenance Order Cost Analysis 3: Actual Cost Surcharges for Maintenance Orders : Notification Assignment to Maintenance Order
NEW QUESTION # 35
What are valid item categories for a BOM used in Asset Management? Note: There are 3 correct answers to this question.
- A. F (Functional location)
- B. I (PM Structure element)
- C. D (Document item)
- D. L (Stock item)
- E. E (Equipment)
Answer: B,C,E
NEW QUESTION # 36
Which activities can the technician perform with the Report and Repair Malfunction SAPUI5 app? Note: There are 2 correct answers to this question
- A. Release
* Start Work - B. Release
* Print - C. Schedule
* Dispatch - D. Complete
* Close Report
Answer: A,D
Explanation:
The Report and Repair Malfunction SAPUI5 app is a Fiori app that allows the technician to easily report that a technical object has a malfunction, plan the required repair work, as well as document and confirm the maintenance work when it's done1. With this app, the technician can perform the following activities:
C . Complete and Close Report. This is true because the technician can provide information about the malfunction and the job, confirm the job, and close the malfunction report. The technician can also attach pictures or descriptions of the damage, as well as a URL to provide further information about the technical object or the damage1.
D . Release and Start Work. This is true because the technician can release the malfunction report and start working on the job assigned to them. The technician can also view the details of the technical object, the history of recent repair work, the required spare parts, and the work centers involved1.
The technician cannot perform the following activities with this app:
A . Schedule and Dispatch. This is false because these activities are performed by the planner or the dispatcher, not the technician. The planner or the dispatcher can use the Resource Scheduling app to schedule and dispatch the maintenance orders and operations2.
B . Release and Print. This is false because the technician can only release the malfunction report, not print it. The technician can use the Repair Malfunctions - My Job List app to view the list of all work items assigned to them and their current status, but not to print them1. References: 1: Report and Repair Malfunction 2: Resource Scheduling
NEW QUESTION # 37
You settle a refurbishment order with the batches (valuation types) having price control standard price. What is the effect? Note. There are 2 correct answers to this question.
- A. The goods receipt for the batch refurbished is posted with the value of the moving average price
- B. The effective costs are posted to the respective batch (valuation type).
- C. The effective costs are posted as a credit memo to a price difference account
- D. The goods receipt for the batch refurbished is posted with the value of the standard price.
Answer: C,D
Explanation:
When you settle a refurbishment order with the batches (valuation types) having price control standard price, the following effects occur:
The effective costs are posted as a credit memo to a price difference account. This means that the difference between the actual costs of the refurbishment and the standard price of the batch is recorded as a variance in the accounting document. This ensures that the inventory value of the batch is not affected by the refurbishment costs1 The goods receipt for the batch refurbished is posted with the value of the standard price. This means that the inventory value of the batch is updated with the predefined price that is maintained in the material master. This ensures that the inventory value of the batch is consistent and stable1 The other options are incorrect because:
The effective costs are not posted to the respective batch (valuation type). The batch valuation is based on the standard price, not the actual costs of the refurbishment1 The goods receipt for the batch refurbished is not posted with the value of the moving average price. The moving average price is only used for batches with price control moving average price, not standard price1
NEW QUESTION # 38
......